India's Leading Supplier Of Science Education Resources

Lagged Pipe Apparatus

Product Cat # EL1204

QTY


Three concentric pipes put on a suitable stand make up the e ...

Enquire Now

Three concentric pipes put on a suitable stand make up the equipment. A lagging substance is used to fill the spaces between the innermost and middle pipes, and another lagging material is used to fill the spaces between the middle and outermost pipes. A cartridge heater is installed at the pipe's axle length to heat the lagged pipe. The input to the heater can be measured using the voltmeter and ammeter on the panel. The thermocouples affixed to the pipe's surfaces can measure the intermediate temperatures. So, it is possible to determine the materials' final conductivity.

Experimental objectives

Plot the radial temperature distribution in the composite cylinder and determine the thermal conductivity of the pipe insulation

Specifications

  • Innermost Gl pipe   6 cm. (Outer Diameter)
  • Middle Gl Pipe   8.5 cm. (Mean Diameter)
  • Outermost GI Pipe  10.7 cm. (inner Diameter)
  • Length of pipes 1 Meter.
  • Nichrome wire cartridge heater placed centrally, of suitable capacity.
  • Single Phase Dimmerstat  1 No.
  • Voltmeter (0 – 250V)  1 No.
  • Ammeter (0- 2A)  1 No.
  • Multichannel Digital Temperature Indicator ranging (0 – 300 C) using Cr/AI Thermocouples

Required Other Items but not Included with above supply

  • AC Single Phase 230 V electric supply
  • Floor Area 1.5 Meter X 1 Meter X 0.5 Meter High


Related Products

WhatsApp Button