India's Leading Supplier Of Science Education Resources

Lagged Pipe Apparatus

Product Cat # EL1204

QTY


Three concentric pipes put on a suitable stand make up the  ...

Enquire Now

Three concentric pipes put on a suitable stand make up the equipment. A lagging substance is used to fill the spaces between the innermost and middle pipes, and another lagging material is used to fill the spaces between the middle and outermost pipes. A cartridge heater is installed at the pipe's axle length to heat the lagged pipe. The input to the heater can be measured using the voltmeter and ammeter on the panel. The thermocouples affixed to the pipe's surfaces can measure the intermediate temperatures. So, it is possible to determine the materials' final conductivity.

SPECIFICATIONS:

  • Pipes :

  a)Gl pipe (innermost) – 6 cm. (Outer Diameter).

  b) Gl Pipe (Middle) – 8.5 cm. (Mean Diameter)

  c)G! Pipe (Outermost) – 10.7 cm. (inner Diameter)

  d)Length of pipes 1 Meter.

  • Heater :
  •   Nichrome wire cartridge heater placed centrally, of suitable capacity.
  • Control Panel :

  a)Single Phase Dimmerstat – 1 No.

  b)Voltmeter (0 – 250V) – 1 No.

  c)Ammeter (0- 2A) – 1 No.

  • Temperature Indicator :

  Multichannel Digital Temperature Indicator ranging (0 – 300 C) using Cr/AI Thermocouples

 

Services Required:

  •  A.C. Single Phase 230 V electric supply
  • Floor Area-1.5 Meter X 1 Meter X 0.5 Meter High


Related Products

WhatsApp Button